More finishing work

Archived in the category: Finishing
Posted by: admin - 1 Comment

Here you will see pictures of the master bath shower, the kitchen cooktop area, the foyer chandeliers, the guest bath shower and sink, Laura’s edging work around the driveway and her firepit project.

twitter
Facebooktwittermail
29
Sep

One of several cabinet f-ups

Archived in the category: Finishing
Posted by: admin - 0 Comments

The open space in the drawers (3) are there to surround a drain pipe for the vessel sinks (2) in the master bath and the vessel sink in the guest bath.

If we were using sewer pipes and not the standard 3″ drain pipes, the size of the openings would make sense.

Also, check out the jerry-rigged partition. Instead of using a single piece of wood, they screwed two pieces together.

Needless to say, they WILL correct this!

Update: Old River Cabinets rebuilt the drawers to fit around the sink pipe. They did an excellent job as the picture below shows.

twitter
Facebooktwittermail
29
Sep

Approaching the finish line

Archived in the category: Finishing
Posted by: admin - 0 Comments

These are some more pictures taken in August showing the progress of the outside and inside.

We had a great crew come in from a neighboring town to do the final clearing and grading of the pasture. Grass seed has been thrown and at the time of the pictures, we are starting our two-week drought.

The kitchen cabinets have arrived (more about that later) and are waiting to be installed.

The kitchen floor is near-black tile, which might be tricky to keep sparkling. Oh well.