Picked up the certificate of occupancy today – the house is ready for us!
But first, a few more pictures.
The living area:
[nggallery id=21]
Master suite:
[nggallery id=18]
Guest suite:
[nggallery id=19]
Kitchen:
[nggallery id=17]
Office:
[nggallery id=20]
Mud room:
[nggallery id=22]


Here you will see pictures of the master bath shower, the kitchen cooktop area, the foyer chandeliers, the guest bath shower and sink, Laura’s edging work around the driveway and her firepit project.
[nggallery id=16]


The open space in the drawers (3) are there to surround a drain pipe for the vessel sinks (2) in the master bath and the vessel sink in the guest bath.
If we were using sewer pipes and not the standard 3″ drain pipes, the size of the openings would make sense.
Also, check out the jerry-rigged partition. Instead of using a single piece of wood, they screwed two pieces together.
Needless to say, they WILL correct this!
[nggallery id=15]
Update: Old River Cabinets rebuilt the drawers to fit around the sink pipe. They did an excellent job as the picture below shows.
[nggallery id=23]


These are some more pictures taken in August showing the progress of the outside and inside.
We had a great crew come in from a neighboring town to do the final clearing and grading of the pasture. Grass seed has been thrown and at the time of the pictures, we are starting our two-week drought.
The kitchen cabinets have arrived (more about that later) and are waiting to be installed.
The kitchen floor is near-black tile, which might be tricky to keep sparkling. Oh well.
[nggallery id=14]


Photos of drywall before taping and mudding.
[nggallery id=13]


Fireplace.
[nggallery id=10]


Insulation.
[nggallery id=9]


Standing-seam roof.
[nggallery id=8]


Unfinished front decks.
[nggallery id=12]
Unfinished back decks.
[nggallery id=11]


Exterior with partial siding.
[nggallery id=7]